TAP153759

Substation

Missouri · CITY UTILITIES OF SPRINGFIELD - (MO)

Max voltage
161
kV

TAP153759 is an electric transmission substation in Missouri, operated by CITY UTILITIES OF SPRINGFIELD - (MO). It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorCITY UTILITIES OF SPRINGFIELD - (MO)
Coordinates37.2367, -93.3665

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#22825161 kVCITY UTILITIES OF SPRINGFIELD - (MO)IN SERVICE0.0 mi
#22869161 kVCITY UTILITIES OF SPRINGFIELD - (MO)IN SERVICE2.0 mi
#50563161 kVCITY UTILITIES OF SPRINGFIELD - (MO)IN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP153759, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP153759 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BROOKLINESubstation-AdjacentMOGreene County345 kV600 MW3.4 yrs78.6
BROOKLINESubstation-AdjacentMOGreene County345 kV600 MW1.4 yrs75.3
UNKNOWN117559Substation-AdjacentMOGreene County161 kV100 MW1.4 yrs71.9
TAP153759Substation-AdjacentMOGreene County161 kV100 MW1.4 yrs71.5
UNKNOWN117398Substation-AdjacentMOGreene County161 kV100 MW1.4 yrs71.4
UNKNOWN117682Substation-AdjacentMOGreene County161 kV100 MW1.4 yrs71.4
NICHOLSSubstation-AdjacentMOGreene County161 kV100 MW1.4 yrs71.3
UNKNOWN117397Substation-AdjacentMOGreene County161 kV100 MW1.4 yrs71.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP153759 substation, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.