TAP140544
SubstationMissouri · KCP&L GREATER MISSOURI OPERATIONS CO.
TAP140544 is an electric transmission substation in Missouri, operated by KCP&L GREATER MISSOURI OPERATIONS CO.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #30374 | 161 kV | KCP&L GREATER MISSOURI OPERATIONS CO. | IN SERVICE | 14.0 mi |
| #32630 | 161 kV | KCP&L GREATER MISSOURI OPERATIONS CO. | IN SERVICE | 0.0 mi |
| #34375 | 161 kV | KCP&L GREATER MISSOURI OPERATIONS CO. | IN SERVICE | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP140544, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN121019 | Substation-Adjacent | MO | Saline County | 161 kV | 100 MW | 1.4 yrs | 68.2 |
| UNKNOWN121020 | Substation-Adjacent | MO | Saline County | 161 kV | 100 MW | 1.4 yrs | 67.4 |
| UNKNOWN117426 | Substation-Adjacent | MO | Carroll County | 161 kV | 100 MW | 1.4 yrs | 66.3 |
| Greenfield (SIBLEY - OVERTON (345KV)) | Greenfield | MO | Cooper County | 345 kV | 600 MW | 1.4 yrs | 66.3 |
| UNKNOWN122832 | Substation-Adjacent | MO | Saline County | 161 kV | 100 MW | 1.4 yrs | 66.1 |
| UNKNOWN117665 | Substation-Adjacent | MO | Saline County | 161 kV | 100 MW | 1.4 yrs | 66.1 |
| UNKNOWN121021 | Substation-Adjacent | MO | Saline County | 161 kV | 100 MW | 1.4 yrs | 65.9 |
| UNKNOWN117417 | Substation-Adjacent | MO | Chariton County | 161 kV | 100 MW | 1.4 yrs | 65.9 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.