TAP138927

Substation

Missouri

Max voltage
161
kV

TAP138927 is an electric transmission substation in Missouri. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates39.0772, -94.4896

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20673161 kVIN SERVICE1.1 mi
#28985161 kVIN SERVICE2.1 mi
#45551161 kVIN SERVICE3.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138927, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138927 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117601Substation-AdjacentKSJohnson County345 kV600 MW3.5 yrs75.9
UNKNOWN117601Substation-AdjacentMOCass County345 kV600 MW1.4 yrs74.4
SIBLEYSubstation-AdjacentMOJackson County345 kV600 MW1.4 yrs73.5
TAP138882Substation-AdjacentMOClay County161 kV100 MW1.4 yrs73.0
HAWTHORNESubstation-AdjacentMOJackson County345 kV600 MW1.4 yrs72.9
UNKNOWN117461Substation-AdjacentMOPlatte County161 kV100 MW3.5 yrs72.6
STILWELLSubstation-AdjacentKSJohnson County345 kV600 MW3.5 yrs72.6
UNKNOWN117393Substation-AdjacentMOPlatte County161 kV100 MW3.5 yrs72.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138927 substation, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.