TAP138910

Substation

Missouri · UNION ELECTRIC CO - (MO)

Max voltage
138
kV

TAP138910 is an electric transmission substation in Missouri, operated by UNION ELECTRIC CO - (MO). It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorUNION ELECTRIC CO - (MO)
Coordinates38.2757, -92.3624

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1096138 kVUNION ELECTRIC CO - (MO)IN SERVICE0.0 mi
#40216138 kVUNION ELECTRIC CO - (MO)IN SERVICE10.8 mi
#49261138 kVUNION ELECTRIC CO - (MO)IN SERVICE18.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138910, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138910 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FRANKSSubstation-AdjacentMOPulaski County345 kV600 MW1.4 yrs70.6
UNKNOWN121199Substation-AdjacentMOMoniteau County161 kV100 MW1.4 yrs68.9
TAP138904Substation-AdjacentMOMoniteau County161 kV100 MW1.4 yrs67.7
UNKNOWN121305Substation-AdjacentMOCole County161 kV100 MW1.4 yrs66.5
MARIOSA DELTASubstation-AdjacentMOOsage County345 kV600 MW1.4 yrs66.2
MOREAUSubstation-AdjacentMOCole County161 kV100 MW1.4 yrs65.9
TAP138905Substation-AdjacentMOMoniteau County161 kV100 MW1.4 yrs65.7
UNKNOWN117711Substation-AdjacentMOMoniteau County161 kV100 MW1.4 yrs65.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.