TAP138904

Substation

Missouri · UNION ELECTRIC CO - (MO)

Max voltage
161
kV

TAP138904 is an electric transmission substation in Missouri, operated by UNION ELECTRIC CO - (MO). It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorUNION ELECTRIC CO - (MO)
Coordinates38.6256, -92.5817

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#5915161 kVUNION ELECTRIC CO - (MO)IN SERVICE1.1 mi
#13259161 kVUNION ELECTRIC CO - (MO)IN SERVICE0.0 mi
#38463161 kVUNION ELECTRIC CO - (MO)IN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138904, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138904 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP140550Substation-AdjacentMOBoone County345 kV600 MW1.4 yrs74.6
UNKNOWN117843Substation-AdjacentMOBoone County161 kV100 MW1.4 yrs69.8
UNKNOWN121199Substation-AdjacentMOMoniteau County161 kV100 MW1.4 yrs68.9
OVERTON (161KV)Substation-AdjacentMOCooper County161 kV100 MW1.4 yrs68.2
TAP138904Substation-AdjacentMOMoniteau County161 kV100 MW1.4 yrs67.7
Greenfield (SIBLEY - OVERTON (345KV))GreenfieldMOCooper County345 kV600 MW1.4 yrs67.7
TAP140552Substation-AdjacentMOBoone County161 kV100 MW1.4 yrs67.3
UNKNOWN117725Substation-AdjacentMOBoone County161 kV100 MW1.4 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.