TAP138901

Substation

Missouri · UNION ELECTRIC CO - (MO)

Max voltage
161
kV

TAP138901 is an electric transmission substation in Missouri, operated by UNION ELECTRIC CO - (MO). It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorUNION ELECTRIC CO - (MO)
Coordinates38.3708, -92.6074

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#922161 kVUNION ELECTRIC CO - (MO)IN SERVICE0.0 mi
#3194161 kVUNION ELECTRIC CO - (MO)IN SERVICE0.9 mi
#37132161 kVUNION ELECTRIC CO - (MO)IN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138901, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138901 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN121199Substation-AdjacentMOMoniteau County161 kV100 MW1.4 yrs68.9
TAP138904Substation-AdjacentMOMoniteau County161 kV100 MW1.4 yrs67.7
UNKNOWN121305Substation-AdjacentMOCole County161 kV100 MW1.4 yrs66.5
UNKNOWN117711Substation-AdjacentMOMoniteau County161 kV100 MW1.4 yrs65.7
TAP138905Substation-AdjacentMOMoniteau County161 kV100 MW1.4 yrs65.7
TAP138903Substation-AdjacentMOMoniteau County161 kV100 MW1.4 yrs64.4
UNKNOWN117963Substation-AdjacentMOCole County161 kV100 MW1.4 yrs63.7
TAP138911Substation-AdjacentMOMiller County138 kV100 MW1.4 yrs63.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138901 substation, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.