MARIES

Substation

Missouri · UNION ELECTRIC CO - (MO)

Max voltage
161
kV

MARIES is an electric transmission substation in Missouri, operated by UNION ELECTRIC CO - (MO). It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership & operation

OperatorUNION ELECTRIC CO - (MO)
Coordinates38.0670, -92.0382

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21671161 kVUNION ELECTRIC CO - (MO)IN SERVICE0.3 mi
#23127161 kVUNION ELECTRIC CO - (MO)IN SERVICE6.4 mi
#24117161 kVUNION ELECTRIC CO - (MO)IN SERVICE5.9 mi
#36539161 kVUNION ELECTRIC CO - (MO)IN SERVICE11.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MARIES, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MARIES substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FRANKSSubstation-AdjacentMOPulaski County345 kV600 MW1.4 yrs70.6
UNKNOWN117771Substation-AdjacentMOPulaski County161 kV100 MW1.4 yrs65.7
UNKNOWN117731Substation-AdjacentMOGasconade County161 kV100 MW1.4 yrs65.2
TAP138938Substation-AdjacentMOPhelps County138 kV100 MW4.6 yrs65.2
Greenfield (FRANKS - TAP153680)GreenfieldMOPhelps County345 kV600 MW1.4 yrs64.6
UNKNOWN117083Substation-AdjacentMOCole County138 kV100 MW1.4 yrs64.3
Greenfield (FRANKS - HUBEN)GreenfieldMOPulaski County345 kV600 MW1.4 yrs64.1
UNKNOWN117817Substation-AdjacentMOPulaski County161 kV100 MW1.4 yrs64.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MARIES substation, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.