AUDRAIN

Substation

Missouri · UNION ELECTRIC CO - (MO)

Max voltage
345
kV

AUDRAIN is an electric transmission substation in Missouri, operated by UNION ELECTRIC CO - (MO). It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorUNION ELECTRIC CO - (MO)
Coordinates39.3106, -91.5344

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#44076345 kVUNION ELECTRIC CO - (MO)0.1 mi
#49688345 kVUNION ELECTRIC CO - (MO)IN SERVICE0.1 mi
#49885345 kVUNION ELECTRIC CO - (MO)IN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of AUDRAIN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near AUDRAIN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
AUDRAINSubstation-AdjacentMORalls County345 kV600 MW1.4 yrs73.7
TAP140542Substation-AdjacentMOMontgomery County345 kV600 MW4.6 yrs71.5
TAP140530Substation-AdjacentMORalls County345 kV600 MW1.4 yrs69.2
Greenfield (TAP140550 - MONTGOMERY)GreenfieldMOCallaway County345 kV600 MW4.6 yrs66.8
Greenfield (TAP140530 - TAP140541)GreenfieldMORalls County345 kV600 MW1.4 yrs65.6
Greenfield (TAP140530 - TAP140541)GreenfieldMORalls County345 kV600 MW1.4 yrs65.3
Greenfield (TAP140542 - MONTGOMERY)GreenfieldMOAudrain County345 kV600 MW4.6 yrs64.7
TAP140529Substation-AdjacentMORalls County161 kV100 MW4.6 yrs64.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for AUDRAIN substation, Missouri. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.