TAP154374 is an electric transmission substation in Mississippi, operated by TENNESSEE VALLEY AUTHORITY. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorTENNESSEE VALLEY AUTHORITY
Coordinates34.7991, -88.8389

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#61915161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE22.4 mi
#61916161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE3.2 mi
#61917161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154374, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154374 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PLEASANT HILLSubstation-AdjacentMSUnion County500 kV1,000 MW1.4 yrs76.6
BENTONSubstation-AdjacentMSBenton County500 kV1,000 MW1.4 yrs74.8
MIDDLETONSubstation-AdjacentTNHardeman County161 kV100 MW3.7 yrs69.6
Greenfield (PLEASANT HILL - BENTON)GreenfieldMSTippah County500 kV1,000 MW1.4 yrs69.3
TAP154407Substation-AdjacentTNMcNairy County161 kV100 MW3.7 yrs69.1
TAP154414Substation-AdjacentTNHardeman County161 kV100 MW3.7 yrs68.5
UNKNOWN111021Substation-AdjacentMSUnion County161 kV100 MW1.4 yrs68.4
UNKNOWN169436Substation-AdjacentMSAlcorn County161 kV100 MW1.4 yrs68.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154374 substation, Mississippi. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.