WRENSHALL

Substation

Minnesota · ALLETE, INC.

Max voltage
115
kV

WRENSHALL is an electric transmission substation in Minnesota, operated by ALLETE, INC.. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorALLETE, INC.
Co-ownerMINNESOTA POWER INC
Coordinates46.6720, -92.3618

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21313115 kVMINNESOTA POWER INCIN SERVICE6.9 mi
#42153115 kVALLETE, INC.IN SERVICE2.2 mi
#59648115 kVMINNESOTA POWER INCIN SERVICE3.8 mi
#65188115 kVMINNESOTA POWER INC0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WRENSHALL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WRENSHALL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
HILLTOP 230/115KVSubstation-AdjacentMNCarlton County230 kV300 MW1.4 yrs73.0
UNKNOWN129277Substation-AdjacentMNCarlton County115 kV100 MW1.4 yrs71.7
M L HibbardBrownfieldWIDouglas50 MW71.4
UNKNOWN130957Substation-AdjacentWIDouglas County115 kV100 MW1.4 yrs71.2
TAP135605Substation-AdjacentMNCarlton County230 kV300 MW1.4 yrs70.0
Greenfield (STONE LAKE - ARROWHEAD)GreenfieldMNCarlton County345 kV600 MW1.4 yrs70.0
POTLATCH 115KVSubstation-AdjacentMNCarlton County115 kV100 MW1.4 yrs69.9
LAKE SUPERIOR PAPERSubstation-AdjacentWIDouglas County115 kV100 MW1.4 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WRENSHALL substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.