WING RIVER

Substation

Minnesota · ALLETE, INC.

Max voltage
230
kV

WING RIVER is an electric transmission substation in Minnesota, operated by ALLETE, INC.. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorALLETE, INC.
Co-ownerMINNESOTA POWER INC
Coordinates46.3483, -94.7753

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3366230 kVALLETE, INC.IN SERVICE49.2 mi
#33085230 kVIN SERVICE19.4 mi
#30281115 kVALLETE, INC.IN SERVICE16.6 mi
#40236115 kVMINNESOTA POWER INCIN SERVICE1.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WING RIVER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WING RIVER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN129849Substation-AdjacentMNWadena County115 kV100 MW1.4 yrs68.3
TAP136167Substation-AdjacentMNWadena County115 kV100 MW1.4 yrs68.3
RIVERTON 230/115 KVSubstation-AdjacentMNCrow Wing County230 kV300 MW1.4 yrs68.2
BADOURA 230/115 KVSubstation-AdjacentMNWadena County230 kV300 MW1.4 yrs67.4
Greenfield (RIVERTON 230/115 KV - WING RIV)GreenfieldMNWadena County230 kV300 MW1.4 yrs66.2
WING RIVERSubstation-AdjacentMNWadena County230 kV300 MW1.4 yrs65.0
Greenfield (BADOURA 230/115 KV - RIVERTON )GreenfieldMNCrow Wing County230 kV300 MW1.4 yrs63.9
UNKNOWN129728Substation-AdjacentMNCass County115 kV100 MW1.4 yrs63.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WING RIVER substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.