TOMAHAWK-ATC 115KV

Substation

Minnesota · NORTHERN STATES POWER CO

Max voltage
115
kV

TOMAHAWK-ATC 115KV is an electric transmission substation in Minnesota, operated by NORTHERN STATES POWER CO. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorNORTHERN STATES POWER CO
Co-ownerNORTHERN STATES POWER CO - WISCONSIN
Coordinates45.4072, -89.7474

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6901115 kVNORTHERN STATES POWER CO0.1 mi
#32195115 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE11.8 mi
#47424115 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE3.6 mi
#64578115 kVNORTHERN STATES POWER CO - WISCONSIN0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TOMAHAWK-ATC 115KV, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TOMAHAWK-ATC 115KV substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PINE (WPS)Substation-AdjacentWILincoln County115 kV100 MW1.4 yrs67.5
BUNKER HILLSubstation-AdjacentWILincoln County115 kV100 MW1.4 yrs65.2
GRANDFATHER FALLSSubstation-AdjacentWILincoln County115 kV100 MW1.4 yrs65.0
Greenfield (PINE (WPS) - TAP139528)GreenfieldWILincoln County115 kV100 MW1.4 yrs62.2
Greenfield (KELLY - BUNKER HILL)GreenfieldWIMarathon County115 kV100 MW1.4 yrs61.7
MAINESubstation-AdjacentWIMarathon County115 kV100 MW1.4 yrs61.6
PACKAGING OF AMERICA TOMAHAWK MILLSubstation-AdjacentWILincoln County115 kV100 MW1.4 yrs60.8
Greenfield (PINE (WPS) - TAP139528)GreenfieldWILincoln County115 kV100 MW1.4 yrs60.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TOMAHAWK-ATC 115KV substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.