TAP171232

Substation

Minnesota · ALLETE, INC.

Max voltage
115
kV

TAP171232 is an electric transmission substation in Minnesota, operated by ALLETE, INC.. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorALLETE, INC.
Co-ownerNORTHERN STATES POWER CO - MINNESOTA
Coordinates45.9283, -94.9308

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#60388115 kVNORTHERN STATES POWER CO - MINNESOTAIN SERVICE9.9 mi
#60389115 kVIN SERVICE1.0 mi
#60390115 kVALLETE, INC.IN SERVICE9.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP171232, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP171232 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNPope County400 kV600 MW1.4 yrs69.9
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNStearns County400 kV600 MW1.4 yrs68.0
Greenfield (QUARRY - ALEXANDRIA)GreenfieldMNStearns County345 kV600 MW1.4 yrs67.4
Greenfield (QUARRY - ALEXANDRIA)GreenfieldMNTodd County345 kV600 MW1.4 yrs67.0
ALEXANDRIASubstation-AdjacentMNDouglas County345 kV600 MW1.4 yrs66.9
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNStearns County400 kV600 MW1.4 yrs66.9
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNPope County400 kV600 MW1.4 yrs66.5
UNKNOWN129851Substation-AdjacentMNTodd County115 kV100 MW1.4 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen