TAP170846

Substation

Minnesota · ALLETE, INC.

Max voltage
115
kV

TAP170846 is an electric transmission substation in Minnesota, operated by ALLETE, INC.. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorALLETE, INC.
Co-ownerMINNESOTA POWER INC
Coordinates47.3243, -93.7610

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#59994115 kVMINNESOTA POWER INCIN SERVICE0.2 mi
#59996115 kVALLETE, INC.IN SERVICE0.3 mi
#59997115 kVMINNESOTA POWER INCIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP170846, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP170846 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP167216Substation-AdjacentMNItasca County115 kV100 MW1.4 yrs69.5
UNKNOWN129692Substation-AdjacentMNItasca County230 kV300 MW1.4 yrs69.3
UNKNOWN129599Substation-AdjacentMNItasca County115 kV100 MW1.4 yrs69.0
UNKNOWN130689Substation-AdjacentMNItasca County115 kV100 MW1.4 yrs68.9
TAP135610Substation-AdjacentMNItasca County115 kV100 MW1.4 yrs67.5
Greenfield (UNKNOWN129692 - UNKNOWN129712)GreenfieldMNItasca County230 kV300 MW1.4 yrs66.4
Greenfield (BLACKBERRY - RIVERTON 230/115 )GreenfieldMNAitkin County230 kV300 MW1.4 yrs66.3
Greenfield (UNKNOWN129692 - TAP159921)GreenfieldMNItasca County230 kV300 MW1.4 yrs65.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP170846 substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.