TAP167843

Substation

Minnesota · OTTER TAIL POWER CO

Max voltage
115
kV

TAP167843 is an electric transmission substation in Minnesota, operated by OTTER TAIL POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates44.4967, -95.7361

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#52354115 kVIN SERVICE30.9 mi
#52356115 kVOTTER TAIL POWER COIN SERVICE4.3 mi
#52357115 kVOTTER TAIL POWER COIN SERVICE0.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP167843, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP167843 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LYON COUNTYSubstation-AdjacentMNLyon County345 kV600 MW1.0 yrs71.6
UNKNOWN170998Substation-AdjacentMNYellow Medicine County230 kV300 MW1.0 yrs69.9
MINN VALLEYSubstation-AdjacentMNYellow Medicine County345 kV600 MW1.4 yrs68.8
UNKNOWN170998Substation-AdjacentMNYellow Medicine County230 kV300 MW1.4 yrs68.4
UNKNOWN132492Substation-AdjacentMNLincoln County115 kV100 MW1.4 yrs68.3
UNKNOWN132582Substation-AdjacentMNLyon County115 kV100 MW1.4 yrs67.4
TAP138554Substation-AdjacentMNLac qui Parle County115 kV100 MW1.4 yrs67.4
LYON COUNTYSubstation-AdjacentMNRedwood County345 kV600 MW1.4 yrs67.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.