TAP163521

Substation

Minnesota · NORTHERN STATES POWER CO - WISCONSIN

Max voltage
161
kV

TAP163521 is an electric transmission substation in Minnesota, operated by NORTHERN STATES POWER CO - WISCONSIN. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorNORTHERN STATES POWER CO - WISCONSIN
Coordinates44.8594, -91.4524

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#39936161 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE0.0 mi
#51631161 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE1.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP163521, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP163521 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SEVEN MILESubstation-AdjacentWIEau Claire County161 kV100 MW1.4 yrs71.0
UNKNOWN161952Substation-AdjacentWIEau Claire County161 kV100 MW1.4 yrs70.8
UNKNOWN143576Substation-AdjacentWIEau Claire County161 kV100 MW1.4 yrs70.2
TAP163522Substation-AdjacentWIEau Claire County161 kV100 MW1.4 yrs70.2
ELK MOUNDSubstation-AdjacentWIDunn County161 kV100 MW1.4 yrs69.5
UNKNOWN163509Substation-AdjacentWIEau Claire County161 kV100 MW1.4 yrs69.3
Greenfield (UNKNOWN129869 - KING PLANT)GreenfieldWIDunn County345 kV600 MW1.4 yrs68.7
TAP143514Substation-AdjacentWIChippewa County115 kV100 MW1.4 yrs68.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP163521 substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.