TAP163061

Substation

Minnesota · NORTHERN STATES POWER CO - WISCONSIN

Max voltage
161
kV

TAP163061 is an electric transmission substation in Minnesota, operated by NORTHERN STATES POWER CO - WISCONSIN. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN STATES POWER CO - WISCONSIN
Coordinates45.9804, -91.4846

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#17763161 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE10.0 mi
#17788161 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE2.4 mi
#19388161 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE1.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP163061, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP163061 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
STONE LAKESubstation-AdjacentWISawyer County345 kV600 MW1.4 yrs72.2
UNKNOWN139715Substation-AdjacentWIWashburn County161 kV100 MW1.4 yrs68.9
Greenfield (STONE LAKE - GARDNER PARK)GreenfieldWIRusk County345 kV600 MW1.4 yrs68.1
GINGLESSubstation-AdjacentWIBayfield County161 kV100 MW1.4 yrs67.6
Greenfield (STONE LAKE - GARDNER PARK)GreenfieldWIWashburn County345 kV600 MW1.4 yrs67.1
Greenfield (STONE LAKE - GARDNER PARK)GreenfieldWISawyer County345 kV600 MW1.4 yrs66.8
Greenfield (STONE LAKE - GARDNER PARK)GreenfieldWISawyer County345 kV600 MW1.4 yrs66.2
UNKNOWN139699Substation-AdjacentWIWashburn County161 kV100 MW1.4 yrs66.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP163061 substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.