TAP138563 is an electric transmission substation in Minnesota, operated by OTTER TAIL POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates45.2386, -96.2001

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#33441115 kVOTTER TAIL POWER COIN SERVICE0.0 mi
#41020115 kVOTTER TAIL POWER COIN SERVICE6.6 mi
#49668115 kVOTTER TAIL POWER COIN SERVICE2.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138563, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138563 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN131969Substation-AdjacentMNLac qui Parle County115 kV100 MW1.4 yrs70.4
UNKNOWN131144Substation-AdjacentMNBig Stone County230 kV300 MW1.0 yrs69.9
MORRISSubstation-AdjacentMNStevens County230 kV300 MW1.4 yrs69.9
UNKNOWN170998Substation-AdjacentMNYellow Medicine County230 kV300 MW1.0 yrs69.9
UNKNOWN175846Substation-AdjacentSDGrant County345 kV600 MW1.0 yrs69.8
UNKNOWN131515Substation-AdjacentMNLac qui Parle County115 kV100 MW1.4 yrs69.5
UNKNOWN175849Substation-AdjacentMNBig Stone County345 kV600 MW1.0 yrs69.5
BIG STONESubstation-AdjacentSDGrant County230 kV300 MW1.0 yrs69.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138563 substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.