TAP135626

Substation

Minnesota · ALLETE, INC.

Max voltage
115
kV

TAP135626 is an electric transmission substation in Minnesota, operated by ALLETE, INC.. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorALLETE, INC.
Coordinates46.9439, -92.9215

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#2181115 kVALLETE, INC.IN SERVICE0.0 mi
#3810115 kVALLETE, INC.IN SERVICE0.5 mi
#60327115 kVALLETE, INC.IN SERVICE2.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP135626, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP135626 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FORBESSubstation-AdjacentMNSt. Louis County500 kV1,000 MW1.4 yrs71.1
TAP135605Substation-AdjacentMNCarlton County230 kV300 MW1.4 yrs70.0
Greenfield (FORBES - CHISAGO)GreenfieldMNCarlton County500 kV1,000 MW1.4 yrs68.7
Greenfield (UNKNOWN133416 - ARROWHEAD)GreenfieldMNCarlton County250 kV300 MW1.4 yrs66.7
Greenfield (UNKNOWN133416 - ARROWHEAD)GreenfieldMNAitkin County250 kV300 MW1.4 yrs66.6
UNKNOWN162286Substation-AdjacentMNCarlton County115 kV100 MW1.4 yrs66.4
Greenfield (BLACKBERRY - FORBES)GreenfieldMNItasca County230 kV300 MW1.4 yrs66.2
Greenfield (BLACKBERRY - TAP135605)GreenfieldMNItasca County230 kV300 MW1.4 yrs65.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP135626 substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.