TAP135617
SubstationMinnesota · ALLETE, INC.
TAP135617 is an electric transmission substation in Minnesota, operated by ALLETE, INC.. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #5883 | 115 kV | ALLETE, INC. | IN SERVICE | 14.9 mi |
| #37340 | 115 kV | — | IN SERVICE | 0.0 mi |
| #41449 | 115 kV | — | IN SERVICE | 10.4 mi |
| #48365 | 115 kV | — | IN SERVICE | 8.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP135617, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN129712 | Substation-Adjacent | MN | Hubbard County | 230 kV | 300 MW | 1.4 yrs | 71.1 |
| UNKNOWN134748 | Substation-Adjacent | MN | Hubbard County | 115 kV | 100 MW | 1.4 yrs | 69.1 |
| WILTON | Substation-Adjacent | MN | Clearwater County | 230 kV | 300 MW | 1.4 yrs | 68.0 |
| TAP135616 | Substation-Adjacent | MN | Hubbard County | 115 kV | 100 MW | 1.4 yrs | 66.8 |
| BEMIDJI 115KV | Substation-Adjacent | MN | Hubbard County | 115 kV | 100 MW | 1.4 yrs | 66.6 |
| UNKNOWN130123 | Substation-Adjacent | MN | Hubbard County | 115 kV | 100 MW | 1.4 yrs | 65.9 |
| Greenfield (UNKNOWN129712 - WILTON) | Greenfield | MN | Hubbard County | 230 kV | 300 MW | 1.4 yrs | 65.3 |
| TAP134739 | Substation-Adjacent | MN | Hubbard County | 115 kV | 100 MW | 1.4 yrs | 65.1 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP135617 substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.