TAP134736

Substation

Minnesota

Max voltage
230
kV

TAP134736 is an electric transmission substation in Minnesota. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates48.6526, -94.5593

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#87230 kVIN SERVICE39.6 mi
#47004230 kVIN SERVICE0.0 mi
#49584230 kVIN SERVICE0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP134736, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP134736 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN129718Substation-AdjacentMNLake of the Woods County230 kV300 MW1.4 yrs63.7
Greenfield (TAP134737 - LITTLEFORK)GreenfieldMNLake of the Woods County230 kV300 MW1.4 yrs62.8
Greenfield (ROSEAU COUNTY - FORBES)GreenfieldMNLake of the Woods County500 kV1,000 MW1.4 yrs62.7
Greenfield (ROSEAU COUNTY - FORBES)GreenfieldMNLake of the Woods County500 kV1,000 MW1.4 yrs62.7
Greenfield (ROSEAU COUNTY - FORBES)GreenfieldMNLake of the Woods County500 kV1,000 MW1.4 yrs61.3
Greenfield (ROSEAU COUNTY - FORBES)GreenfieldMNLake of the Woods County500 kV1,000 MW1.4 yrs61.0
Greenfield (ROSEAU COUNTY - FORBES)GreenfieldMNKoochiching County500 kV1,000 MW1.4 yrs60.9
Greenfield (UNKNOWN129817 - TAP134736)GreenfieldMNLake of the Woods County230 kV300 MW1.4 yrs59.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP134736 substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.