TAP134729
SubstationMinnesota · MINNESOTA POWER INC
TAP134729 is an electric transmission substation in Minnesota, operated by MINNESOTA POWER INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #22665 | 115 kV | MINNESOTA POWER INC | IN SERVICE | 0.2 mi |
| #45644 | 115 kV | MINNESOTA POWER INC | IN SERVICE | 6.5 mi |
| #59994 | 115 kV | MINNESOTA POWER INC | IN SERVICE | 0.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP134729, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP167216 | Substation-Adjacent | MN | Itasca County | 115 kV | 100 MW | 1.4 yrs | 69.5 |
| UNKNOWN129692 | Substation-Adjacent | MN | Itasca County | 230 kV | 300 MW | 1.4 yrs | 69.3 |
| UNKNOWN129599 | Substation-Adjacent | MN | Itasca County | 115 kV | 100 MW | 1.4 yrs | 69.0 |
| UNKNOWN130689 | Substation-Adjacent | MN | Itasca County | 115 kV | 100 MW | 1.4 yrs | 68.9 |
| TAP135610 | Substation-Adjacent | MN | Itasca County | 115 kV | 100 MW | 1.4 yrs | 67.5 |
| UNKNOWN129643 | Substation-Adjacent | MN | Itasca County | 115 kV | 100 MW | 1.4 yrs | 66.4 |
| Greenfield (UNKNOWN129692 - UNKNOWN129712) | Greenfield | MN | Itasca County | 230 kV | 300 MW | 1.4 yrs | 66.4 |
| Greenfield (BLACKBERRY - RIVERTON 230/115 ) | Greenfield | MN | Aitkin County | 230 kV | 300 MW | 1.4 yrs | 66.3 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP134729 substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.