TAP134724

Substation

Minnesota · MINNESOTA POWER INC

Max voltage
115
kV

TAP134724 is an electric transmission substation in Minnesota, operated by MINNESOTA POWER INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorMINNESOTA POWER INC
Coordinates47.3262, -93.7558

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3750115 kVMINNESOTA POWER INCIN SERVICE0.8 mi
#22665115 kVMINNESOTA POWER INCIN SERVICE0.2 mi
#32207115 kVMINNESOTA POWER INCIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP134724, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP134724 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP167216Substation-AdjacentMNItasca County115 kV100 MW1.4 yrs69.5
UNKNOWN129692Substation-AdjacentMNItasca County230 kV300 MW1.4 yrs69.3
UNKNOWN129599Substation-AdjacentMNItasca County115 kV100 MW1.4 yrs69.0
UNKNOWN130689Substation-AdjacentMNItasca County115 kV100 MW1.4 yrs68.9
TAP135610Substation-AdjacentMNItasca County115 kV100 MW1.4 yrs67.5
UNKNOWN129643Substation-AdjacentMNItasca County115 kV100 MW1.4 yrs66.4
Greenfield (UNKNOWN129692 - UNKNOWN129712)GreenfieldMNItasca County230 kV300 MW1.4 yrs66.4
Greenfield (BLACKBERRY - RIVERTON 230/115 )GreenfieldMNAitkin County230 kV300 MW1.4 yrs66.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP134724 substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.