TAP134721

Substation

Minnesota · MINNESOTA POWER INC

Max voltage
115
kV

TAP134721 is an electric transmission substation in Minnesota, operated by MINNESOTA POWER INC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorMINNESOTA POWER INC
Coordinates47.2117, -91.4123

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#22950115 kVMINNESOTA POWER INCIN SERVICE0.2 mi
#27751115 kVMINNESOTA POWER INCIN SERVICE0.2 mi
#47369115 kVMINNESOTA POWER INCIN SERVICE29.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP134721, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP134721 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP138647Substation-AdjacentWIBayfield County115 kV100 MW1.4 yrs66.7
UNKNOWN129250Substation-AdjacentMNLake County115 kV100 MW1.4 yrs65.8
UNKNOWN129253Substation-AdjacentMNLake County115 kV100 MW1.4 yrs64.6
TAP138646Substation-AdjacentMNLake County115 kV100 MW1.4 yrs61.5
UNKNOWN129252Substation-AdjacentMNLake County115 kV100 MW1.4 yrs61.0
Greenfield (TAP134721 - TAP138646)GreenfieldMNLake County115 kV100 MW1.4 yrs60.3
UNKNOWN129249Substation-AdjacentMNLake County115 kV100 MW1.4 yrs60.1
UNKNOWN130695Substation-AdjacentMNLake County115 kV100 MW1.4 yrs59.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP134721 substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.