TAP134506

Substation

Minnesota · OTTER TAIL POWER CO

Max voltage
230
kV

TAP134506 is an electric transmission substation in Minnesota, operated by OTTER TAIL POWER CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates48.8712, -95.4000

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#25043230 kVOTTER TAIL POWER COIN SERVICE6.7 mi
#27178230 kVOTTER TAIL POWER COIN SERVICE0.0 mi
#49272230 kVOTTER TAIL POWER CO70.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP134506, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP134506 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROSEAU COUNTYSubstation-AdjacentMNRoseau County500 kV1,000 MW1.4 yrs74.8
UNKNOWN129817Substation-AdjacentMNRoseau County230 kV300 MW1.4 yrs70.8
Greenfield (ROSEAU COUNTY - FORBES)GreenfieldMNLake of the Woods County500 kV1,000 MW1.4 yrs69.1
Greenfield (ROSEAU COUNTY - None)GreenfieldMNRoseau County500 kV1,000 MW1.4 yrs67.7
Greenfield (ROSEAU COUNTY - None)GreenfieldMNRoseau County500 kV1,000 MW1.4 yrs66.9
Greenfield (ROSEAU COUNTY - None)GreenfieldMNRoseau County500 kV1,000 MW1.4 yrs66.5
TAP134506Substation-AdjacentMNRoseau County230 kV300 MW1.4 yrs66.4
Greenfield (ROSEAU COUNTY - FORBES)GreenfieldMNRoseau County500 kV1,000 MW1.4 yrs66.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP134506 substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.