TACONITE HARBOR ENERGY CENTER

Substation

Minnesota · ALLETE, INC.

Max voltage
138
kV

TACONITE HARBOR ENERGY CENTER is an electric transmission substation in Minnesota, operated by ALLETE, INC.. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage115 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorALLETE, INC.
Co-ownerMINNESOTA POWER INC
Coordinates47.5314, -90.9122

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#39282138 kVALLETE, INC.IN SERVICE61.1 mi
#49880138 kVALLETE, INC.IN SERVICE61.1 mi
#21030115 kVMINNESOTA POWER INCIN SERVICE16.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TACONITE HARBOR ENERGY CENTER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TACONITE HARBOR ENERGY CENTER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TACONITE HARBOR ENERGY CENTERSubstation-AdjacentMNLake County138 kV100 MW1.4 yrs68.1
UNKNOWN129253Substation-AdjacentMNLake County115 kV100 MW1.4 yrs64.6
UNKNOWN129252Substation-AdjacentMNLake County115 kV100 MW1.4 yrs61.0
OZ LakeGreenfieldMNLake1.4 yrs59.3
TAP134625Substation-AdjacentMNLake County115 kV100 MW1.4 yrs58.5
SILVER BAY POWERSubstation-AdjacentMNLake County115 kV100 MW1.4 yrs57.4
Greenfield (TACONITE HARBOR ENERGY CENTER )GreenfieldMNLake County138 kV100 MW1.4 yrs56.1
EC Near Taconite Harbor Energy CenterGreenfieldMNCook1.4 yrs55.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TACONITE HARBOR ENERGY CENTER substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.