SYL LASKIN
SubstationMinnesota · ALLETE, INC.
SYL LASKIN is an electric transmission substation in Minnesota, operated by ALLETE, INC.. It is classified as sub-transmission (138 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #30427 | 138 kV | ALLETE, INC. | IN SERVICE | 3.5 mi |
| #5836 | 115 kV | ALLETE, INC. | IN SERVICE | 10.2 mi |
| #29443 | 115 kV | ALLETE, INC. | IN SERVICE | 3.2 mi |
| #37203 | 115 kV | ALLETE, INC. | IN SERVICE | 31.5 mi |
| #60317 | 115 kV | ALLETE, INC. | IN SERVICE | 11.3 mi |
| #64064 | 115 kV | ALLETE, INC. | — | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of SYL LASKIN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN129400 | Substation-Adjacent | MN | St. Louis County | 115 kV | 100 MW | 1.4 yrs | 66.9 |
| TAP134629 | Substation-Adjacent | MN | St. Louis County | 138 kV | 100 MW | 1.4 yrs | 66.1 |
| UNKNOWN130417 | Substation-Adjacent | MN | St. Louis County | 138 kV | 100 MW | 1.4 yrs | 65.7 |
| UNKNOWN129391 | Substation-Adjacent | MN | St. Louis County | 115 kV | 100 MW | 1.4 yrs | 64.6 |
| SYL LASKIN | Substation-Adjacent | MN | St. Louis County | 138 kV | 100 MW | 1.4 yrs | 63.5 |
| UNKNOWN171196 | Substation-Adjacent | MN | St. Louis County | 115 kV | 100 MW | 1.4 yrs | 63.2 |
| UNKNOWN129384 | Substation-Adjacent | MN | St. Louis County | 115 kV | 100 MW | 1.4 yrs | 61.5 |
| TAP135613 | Substation-Adjacent | MN | St. Louis County | 115 kV | 100 MW | 1.4 yrs | 61.1 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for SYL LASKIN substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.