ST GERMAIN
SubstationMinnesota · NORTHERN STATES POWER CO - WISCONSIN
ST GERMAIN is an electric transmission substation in Minnesota, operated by NORTHERN STATES POWER CO - WISCONSIN. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #37814 | 115 kV | NORTHERN STATES POWER CO - WISCONSIN | IN SERVICE | 10.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of ST GERMAIN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN171267 | Substation-Adjacent | WI | Vilas County | 115 kV | 100 MW | 1.4 yrs | 65.7 |
| ST GERMAIN | Substation-Adjacent | WI | Vilas County | 115 kV | 100 MW | 1.4 yrs | 64.4 |
| RISER139530 | Substation-Adjacent | WI | Vilas County | 115 kV | 100 MW | 1.4 yrs | 64.1 |
| ST GERMAIN | Substation-Adjacent | WI | Vilas County | 115 kV | 100 MW | 1.4 yrs | 63.9 |
| TAP138648 | Substation-Adjacent | WI | Vilas County | 138 kV | 100 MW | 1.4 yrs | 63.7 |
| THREE LAKES | Substation-Adjacent | WI | Oneida County | 115 kV | 100 MW | 1.4 yrs | 63.3 |
| Eagle River | Brownfield | WI | Vilas | — | 4 MW | — | 62.9 |
| CLEAR LAKES (WPS) | Substation-Adjacent | WI | Oneida County | 115 kV | 100 MW | 1.4 yrs | 62.6 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for ST GERMAIN substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.