RIVERTON 230/115 KV

Substation

Minnesota · ALLETE, INC.

Max voltage
230
kV

RIVERTON 230/115 KV is an electric transmission substation in Minnesota, operated by ALLETE, INC.. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

OperatorALLETE, INC.
Co-ownerMINNESOTA POWER INC
Coordinates46.5123, -94.4703

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3366230 kVALLETE, INC.IN SERVICE49.2 mi
#28262230 kVMINNESOTA POWER INCIN SERVICE67.2 mi
#42647230 kVMINNESOTA POWER INCIN SERVICE8.3 mi
#44178230 kVALLETE, INC.IN SERVICE46.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RIVERTON 230/115 KV, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RIVERTON 230/115 KV substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP136167Substation-AdjacentMNWadena County115 kV100 MW1.4 yrs68.3
RIVERTON 230/115 KVSubstation-AdjacentMNCrow Wing County230 kV300 MW1.4 yrs68.2
UNKNOWN129676Substation-AdjacentMNCrow Wing County115 kV100 MW1.4 yrs67.8
BADOURA 230/115 KVSubstation-AdjacentMNWadena County230 kV300 MW1.4 yrs67.4
BRAINERDSubstation-AdjacentMNCrow Wing County115 kV100 MW1.4 yrs65.6
Greenfield (UNKNOWN133416 - ARROWHEAD)GreenfieldMNCass County250 kV300 MW1.4 yrs65.1
WING RIVERSubstation-AdjacentMNWadena County230 kV300 MW1.4 yrs65.0
Greenfield (UNKNOWN133416 - ARROWHEAD)GreenfieldMNCass County250 kV300 MW1.4 yrs64.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RIVERTON 230/115 KV substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.