PINE (WPS)

Substation

Minnesota · NORTHERN STATES POWER CO - WISCONSIN

Max voltage
115
kV

PINE (WPS) is an electric transmission substation in Minnesota, operated by NORTHERN STATES POWER CO - WISCONSIN. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership & operation

OperatorNORTHERN STATES POWER CO - WISCONSIN
Coordinates45.1687, -89.6013

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4867115 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE20.6 mi
#32359115 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE14.7 mi
#38009115 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE10.9 mi
#43871115 kVNORTHERN STATES POWER CO - WISCONSININ SERVICE10.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PINE (WPS), ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PINE (WPS) substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WESTONSubstation-AdjacentWIMarathon County345 kV600 MW1.4 yrs77.4
GARDNER PARKSubstation-AdjacentWIMarathon County345 kV600 MW1.4 yrs73.9
CASSELSubstation-AdjacentWIMarathon County115 kV100 MW1.4 yrs69.9
WHITCOMBSubstation-AdjacentWIMarathon County115 kV100 MW1.4 yrs69.2
SHERMAN STSubstation-AdjacentWIMarathon County115 kV100 MW1.4 yrs69.2
Greenfield (STONE LAKE - GARDNER PARK)GreenfieldWIMarathon County345 kV600 MW1.4 yrs69.0
PINE (WPS)Substation-AdjacentWILincoln County115 kV100 MW1.4 yrs67.5
Greenfield (STONE LAKE - GARDNER PARK)GreenfieldWIMarathon County345 kV600 MW1.4 yrs65.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PINE (WPS) substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.