PACKAGING OF AMERICA TOMAHAWK MILL

Substation

Minnesota · NORTHERN STATES POWER CO

Max voltage
115
kV

PACKAGING OF AMERICA TOMAHAWK MILL is an electric transmission substation in Minnesota, operated by NORTHERN STATES POWER CO. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorNORTHERN STATES POWER CO
Co-ownerNORTHERN STATES POWER CO - WISCONSIN
Coordinates45.4425, -89.7343

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#64578115 kVNORTHERN STATES POWER CO - WISCONSIN0.7 mi
#64579115 kVNORTHERN STATES POWER CO0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PACKAGING OF AMERICA TOMAHAWK MILL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PACKAGING OF AMERICA TOMAHAWK MILL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PINE (WPS)Substation-AdjacentWILincoln County115 kV100 MW1.4 yrs67.5
BUNKER HILLSubstation-AdjacentWILincoln County115 kV100 MW1.4 yrs65.2
GRANDFATHER FALLSSubstation-AdjacentWILincoln County115 kV100 MW1.4 yrs65.0
Greenfield (PINE (WPS) - TAP139528)GreenfieldWILincoln County115 kV100 MW1.4 yrs62.2
Greenfield (KELLY - BUNKER HILL)GreenfieldWIMarathon County115 kV100 MW1.4 yrs61.7
PACKAGING OF AMERICA TOMAHAWK MILLSubstation-AdjacentWILincoln County115 kV100 MW1.4 yrs60.8
Greenfield (PINE (WPS) - TAP139528)GreenfieldWILincoln County115 kV100 MW1.4 yrs60.2
EC Near Rhinelander MillGreenfieldWIOneida1.4 yrs60.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for PACKAGING OF AMERICA TOMAHAWK MILL substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.