MRES ELBOW LAKE

Substation

Minnesota · OTTER TAIL POWER CO

Max voltage
115
kV

MRES ELBOW LAKE is an electric transmission substation in Minnesota, operated by OTTER TAIL POWER CO. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorOTTER TAIL POWER CO
Co-ownerWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates45.9622, -95.7743

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#10178115 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE16.6 mi
#49572115 kVOTTER TAIL POWER COIN SERVICE3.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MRES ELBOW LAKE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MRES ELBOW LAKE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNPope County400 kV600 MW1.4 yrs70.2
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNPope County400 kV600 MW1.4 yrs70.2
UNKNOWN171144Substation-AdjacentMNOtter Tail County230 kV300 MW1.4 yrs70.0
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNGrant County400 kV600 MW1.4 yrs69.9
Greenfield (ALEXANDRIA - BISON)GreenfieldMNGrant County345 kV600 MW1.4 yrs69.3
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNGrant County400 kV600 MW1.4 yrs68.9
Greenfield (ALEXANDRIA - BISON)GreenfieldMNGrant County345 kV600 MW1.4 yrs68.9
Greenfield (COAL CREEK - DICKINSON)GreenfieldMNGrant County400 kV600 MW1.4 yrs68.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.