FREEBORN

Substation

Minnesota · NORTHERN STATES POWER CO - MINNESOTA

Max voltage
161
kV

FREEBORN is an electric transmission substation in Minnesota, operated by NORTHERN STATES POWER CO - MINNESOTA. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN STATES POWER CO - MINNESOTA
Coordinates43.7171, -93.4097

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6550161 kVNORTHERN STATES POWER CO - MINNESOTAIN SERVICE11.4 mi
#42406161 kVNORTHERN STATES POWER CO - MINNESOTAIN SERVICE4.1 mi
#59876161 kVIN SERVICE38.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FREEBORN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FREEBORN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN131061Substation-AdjacentMNFreeborn County161 kV100 MW1.4 yrs74.6
UNKNOWN133291Substation-AdjacentMNFreeborn County161 kV100 MW1.4 yrs74.1
BENT TREE WIND FARM PHASE 1Substation-AdjacentMNFreeborn County161 kV100 MW1.4 yrs73.4
UNKNOWN162881Substation-AdjacentMNFreeborn County161 kV100 MW1.4 yrs72.9
UNKNOWN133291Substation-AdjacentIAWorth County161 kV100 MW1.4 yrs72.7
UNKNOWN129404Substation-AdjacentIAWorth County161 kV100 MW1.4 yrs71.9
FREEBORNSubstation-AdjacentMNFreeborn County161 kV100 MW1.4 yrs71.5
UNKNOWN130512Substation-AdjacentIAWorth County161 kV100 MW1.4 yrs71.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.