COUNCIL CREEK

Substation

Minnesota · AMERICAN TRANSMISSION CO

Max voltage
138
kV

COUNCIL CREEK is an electric transmission substation in Minnesota, operated by AMERICAN TRANSMISSION CO. It is classified as sub-transmission (138 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines1

Ownership & operation

OperatorAMERICAN TRANSMISSION CO
Coordinates43.9695, -90.4957

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#40483138 kVAMERICAN TRANSMISSION COIN SERVICE30.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of COUNCIL CREEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near COUNCIL CREEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN159041Substation-AdjacentWIVernon County161 kV100 MW1.4 yrs66.5
MONROESubstation-AdjacentWIMonroe County161 kV100 MW1.4 yrs65.4
COUNCIL CREEKSubstation-AdjacentWIMonroe County138 kV100 MW1.4 yrs63.3
Greenfield (PETENWELL - COUNCIL CREEK)GreenfieldWIJuneau County138 kV100 MW1.4 yrs60.6
Greenfield (PETENWELL - COUNCIL CREEK)GreenfieldWIMonroe County138 kV100 MW1.4 yrs60.6
Greenfield (JACKSON COUNTY - TREMVAL)GreenfieldWIJackson County161 kV100 MW1.4 yrs60.4
OZ VernonGreenfieldWIVernon1.4 yrs59.3
Greenfield (PETENWELL - COUNCIL CREEK)GreenfieldWIJuneau County138 kV100 MW1.4 yrs55.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.