BEMIDJI 115KV

Substation

Minnesota · OTTER TAIL POWER CO

Max voltage
115
kV

BEMIDJI 115KV is an electric transmission substation in Minnesota, operated by OTTER TAIL POWER CO. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates47.4195, -94.8930

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#6081115 kVOTTER TAIL POWER COIN SERVICE7.7 mi
#49757115 kVOTTER TAIL POWER COIN SERVICE2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BEMIDJI 115KV, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BEMIDJI 115KV substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN129712Substation-AdjacentMNHubbard County230 kV300 MW1.4 yrs71.1
UNKNOWN134748Substation-AdjacentMNHubbard County115 kV100 MW1.4 yrs69.1
WILTONSubstation-AdjacentMNClearwater County230 kV300 MW1.4 yrs68.0
LAKEHEAD PIPELINESubstation-AdjacentMNClearwater County115 kV100 MW1.4 yrs67.4
TAP134741Substation-AdjacentMNClearwater County115 kV100 MW1.4 yrs67.3
TAP134744Substation-AdjacentMNClearwater County115 kV100 MW1.4 yrs67.2
UNKNOWN129825Substation-AdjacentMNClearwater County115 kV100 MW1.4 yrs67.0
BEMIDJI 115KVSubstation-AdjacentMNHubbard County115 kV100 MW1.4 yrs66.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BEMIDJI 115KV substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.