BAGLEY

Substation

Minnesota · OTTER TAIL POWER CO

Max voltage
115
kV

BAGLEY is an electric transmission substation in Minnesota, operated by OTTER TAIL POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorOTTER TAIL POWER CO
Co-ownerWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates47.5680, -95.6182

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18586115 kVOTTER TAIL POWER COIN SERVICE8.1 mi
#20073115 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE28.0 mi
#25913115 kVOTTER TAIL POWER COIN SERVICE10.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BAGLEY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BAGLEY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WINGERSubstation-AdjacentMNMahnomen County230 kV300 MW1.4 yrs72.9
BAGLEYSubstation-AdjacentMNClearwater County115 kV100 MW1.4 yrs68.0
TAP134740Substation-AdjacentMNClearwater County115 kV100 MW1.4 yrs67.6
UNKNOWN129825Substation-AdjacentMNClearwater County115 kV100 MW1.4 yrs67.0
WINGERSubstation-AdjacentMNMahnomen County230 kV300 MW1.4 yrs64.7
UNKNOWN130667Substation-AdjacentMNMahnomen County115 kV100 MW1.4 yrs64.7
Greenfield (WINGER - WILTON)GreenfieldMNMahnomen County230 kV300 MW1.4 yrs63.4
Greenfield (WINGER - WILTON)GreenfieldMNMahnomen County230 kV300 MW1.4 yrs62.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BAGLEY substation, Minnesota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.