WEADOCK

Substation

Michigan · CONSUMERS ENERGY CO

Max voltage
138
kV

WEADOCK is an electric transmission substation in Michigan, operated by CONSUMERS ENERGY CO. It is classified as sub-transmission (138 kv) and connects 9 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines9

Ownership & operation

OperatorCONSUMERS ENERGY CO
Coordinates43.6032, -83.8585

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7006138 kVCONSUMERS ENERGY COIN SERVICE19.1 mi
#11620138 kVCONSUMERS ENERGY COIN SERVICE25.4 mi
#23152138 kVCONSUMERS ENERGY COIN SERVICE17.3 mi
#24326138 kVCONSUMERS ENERGY COIN SERVICE15.5 mi
#33311138 kVCONSUMERS ENERGY COIN SERVICE38.0 mi
#36154138 kVCONSUMERS ENERGY COIN SERVICE15.7 mi
#37668138 kVCONSUMERS ENERGY COIN SERVICE11.7 mi
#39687138 kVCONSUMERS ENERGY COIN SERVICE1.2 mi
#64901138 kVCONSUMERS ENERGY CO0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WEADOCK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WEADOCK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
KARNSubstation-AdjacentMIBay County345 kV600 MW2.2 yrs72.7
TITTABAWASSEESubstation-AdjacentMIMidland County345 kV600 MW2.2 yrs72.6
BAUERSubstation-AdjacentMITuscola County345 kV600 MW2.2 yrs72.1
TAP144602Substation-AdjacentMITuscola County345 kV600 MW2.2 yrs70.8
UNKNOWN128499Substation-AdjacentMISaginaw County345 kV600 MW2.2 yrs69.3
HAMPTONSubstation-AdjacentMIBay County345 kV600 MW2.2 yrs69.3
UNKNOWN140021Substation-AdjacentMISaginaw County138 kV100 MW2.2 yrs67.8
Greenfield (BAUER - HAMPTON)GreenfieldMISaginaw County345 kV600 MW2.2 yrs67.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WEADOCK substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.