TWINING

Substation

Michigan · CONSUMERS ENERGY CO

Max voltage
138
kV

TWINING is an electric transmission substation in Michigan, operated by CONSUMERS ENERGY CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorCONSUMERS ENERGY CO
Coordinates44.1178, -83.9183

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#14438138 kVCONSUMERS ENERGY COIN SERVICE12.8 mi
#20548138 kVCONSUMERS ENERGY COIN SERVICE15.2 mi
#24601138 kVCONSUMERS ENERGY COIN SERVICE13.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TWINING, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TWINING substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GALLAGHERSubstation-AdjacentMIOgemaw County345 kV600 MW2.2 yrs70.6
UNKNOWN157486Substation-AdjacentMIOgemaw County138 kV100 MW2.2 yrs66.2
TAP139896Substation-AdjacentMIOgemaw County138 kV100 MW2.2 yrs65.5
Greenfield (GALLAGHER - TITTABAWASSEE)GreenfieldMIOgemaw County345 kV600 MW2.2 yrs65.1
UNKNOWN128343Substation-AdjacentMIOgemaw County138 kV100 MW2.2 yrs64.9
TAP145814Substation-AdjacentMIOgemaw County138 kV100 MW2.2 yrs64.8
Greenfield (GALLAGHER - TITTABAWASSEE)GreenfieldMIBay County345 kV600 MW2.2 yrs64.6
TAP145642Substation-AdjacentMIOgemaw County138 kV100 MW2.2 yrs64.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen