TAP173883

Substation

Michigan · COMMONWEALTH EDISON CO

Max voltage
138
kV

TAP173883 is an electric transmission substation in Michigan, operated by COMMONWEALTH EDISON CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorCOMMONWEALTH EDISON CO
Coordinates42.0189, -88.7151

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#62130138 kVCOMMONWEALTH EDISON COIN SERVICE18.6 mi
#62131138 kVCOMMONWEALTH EDISON COIN SERVICE10.6 mi
#62132138 kVCOMMONWEALTH EDISON CO2.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP173883, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP173883 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
PLANO (765 KV)Substation-AdjacentILKendall County765 kV1,000 MW4.6 yrs78.7
CHERRY VALLEYSubstation-AdjacentILBoone County345 kV600 MW2.2 yrs74.9
TAP137908Substation-AdjacentILBoone County345 kV600 MW2.2 yrs73.4
PLEASANT VALLEYSubstation-AdjacentILMcHenry County345 kV600 MW2.2 yrs72.7
TAP137873Substation-AdjacentILWinnebago County345 kV600 MW2.2 yrs71.6
MONTGOMERYSubstation-AdjacentILKendall County138 kV100 MW2.2 yrs71.6
RISER167141Substation-AdjacentILDeKalb County138 kV100 MW2.2 yrs71.6
TAP136941Substation-AdjacentILWinnebago County345 kV600 MW2.2 yrs71.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP173883 substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.