TAP159034

Substation

Michigan · WYANDOTTE MUNICIPAL SERV COMM

Max voltage
120
kV

TAP159034 is an electric transmission substation in Michigan, operated by WYANDOTTE MUNICIPAL SERV COMM. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorWYANDOTTE MUNICIPAL SERV COMM
Coordinates42.1240, -83.1848

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11708120 kVWYANDOTTE MUNICIPAL SERV COMMIN SERVICE3.4 mi
#11753120 kVWYANDOTTE MUNICIPAL SERV COMMIN SERVICE0.2 mi
#32874120 kVWYANDOTTE MUNICIPAL SERV COMMIN SERVICE3.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP159034, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP159034 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN128466Substation-AdjacentMIMacomb County345 kV600 MW2.2 yrs77.5
UNKNOWN130399Substation-AdjacentMIWayne County230 kV300 MW2.2 yrs75.5
UNKNOWN128894Substation-AdjacentMIWayne County230 kV300 MW2.2 yrs75.4
UNKNOWN144597Substation-AdjacentMIWayne County230 kV300 MW2.2 yrs75.2
TAP139995Substation-AdjacentMIWayne County230 kV300 MW2.2 yrs75.2
UNKNOWN128440Substation-AdjacentMIWayne County230 kV300 MW2.2 yrs75.0
TAP139989Substation-AdjacentMIWayne County230 kV300 MW2.2 yrs74.9
UNKNOWN128437Substation-AdjacentMIWayne County230 kV300 MW2.2 yrs74.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP159034 substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.