TAP155881

Substation

Michigan

Max voltage
138
kV

TAP155881 is an electric transmission substation in Michigan. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates41.8522, -89.0323

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#14674138 kVIN SERVICE0.2 mi
#14675138 kVIN SERVICE6.3 mi
#14676138 kVIN SERVICE1.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP155881, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP155881 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BYRONSubstation-AdjacentILOgle County345 kV600 MW2.2 yrs75.2
CHERRY VALLEYSubstation-AdjacentILBoone County345 kV600 MW2.2 yrs74.9
TAP137908Substation-AdjacentILBoone County345 kV600 MW2.2 yrs73.4
UNKNOWN122197Substation-AdjacentILLee County345 kV600 MW2.2 yrs72.6
RISER167141Substation-AdjacentILDeKalb County138 kV100 MW2.2 yrs71.6
UNKNOWN160100Substation-AdjacentILDeKalb County138 kV100 MW2.2 yrs71.1
TAP137919Substation-AdjacentILOgle County138 kV100 MW2.2 yrs70.3
SHADY OAKS WIND FARMSubstation-AdjacentILLee County138 kV100 MW2.2 yrs69.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP155881 substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.