TAP145707

Substation

Michigan · CONSUMERS ENERGY CO

Max voltage
138
kV

TAP145707 is an electric transmission substation in Michigan, operated by CONSUMERS ENERGY CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorCONSUMERS ENERGY CO
Coordinates43.0443, -85.4343

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11566138 kVCONSUMERS ENERGY COIN SERVICE3.8 mi
#11569138 kVCONSUMERS ENERGY COIN SERVICE13.7 mi
#11570138 kVCONSUMERS ENERGY COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP145707, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP145707 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GAINESSubstation-AdjacentMIKent County345 kV600 MW2.2 yrs78.7
VERGENNESSubstation-AdjacentMIKent County345 kV600 MW2.2 yrs77.3
KENOWASubstation-AdjacentMIKent County345 kV600 MW1.4 yrs74.1
UNKNOWN129933Substation-AdjacentMIKent County138 kV100 MW2.2 yrs72.2
UNKNOWN128766Substation-AdjacentMIKent County138 kV100 MW2.2 yrs72.2
UNKNOWN128705Substation-AdjacentMIKent County138 kV100 MW2.2 yrs72.0
KENOWASubstation-AdjacentMIKent County345 kV600 MW2.2 yrs71.9
TAP139030Substation-AdjacentMIKent County138 kV100 MW2.2 yrs71.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP145707 substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.