TAP143810

Substation

Michigan

Max voltage
138
kV

TAP143810 is an electric transmission substation in Michigan. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates45.3975, -84.6079

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18160138 kVIN SERVICE12.0 mi
#38357138 kVIN SERVICE2.7 mi
#47722138 kVIN SERVICE17.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143810, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143810 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LIVINGSTON GENERATING STATIONSubstation-AdjacentMIOtsego County138 kV100 MW2.2 yrs68.5
GAYLORD - CONSUMERSSubstation-AdjacentMIOtsego County138 kV100 MW2.2 yrs68.0
UNKNOWN133923Substation-AdjacentMIOtsego County138 kV100 MW2.2 yrs67.7
UNKNOWN128860Substation-AdjacentMIOtsego County138 kV100 MW2.2 yrs67.4
UNKNOWN143797Substation-AdjacentMIEmmet County138 kV100 MW2.2 yrs67.4
GAYLORD - WOLVERINESubstation-AdjacentMIOtsego County138 kV100 MW2.2 yrs67.1
UNKNOWN143796Substation-AdjacentMIAntrim County138 kV100 MW2.2 yrs66.5
VAN TYLESubstation-AdjacentMIOtsego County138 kV100 MW2.2 yrs66.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.