TAP140015

Substation

Michigan · WOLVERINE PWR SUPPLY COOP, INC

Max voltage
138
kV

TAP140015 is an electric transmission substation in Michigan, operated by WOLVERINE PWR SUPPLY COOP, INC. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorWOLVERINE PWR SUPPLY COOP, INC
Coordinates45.0675, -83.8931

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7290138 kVWOLVERINE PWR SUPPLY COOP, INCIN SERVICE0.0 mi
#13003138 kVWOLVERINE PWR SUPPLY COOP, INCIN SERVICE0.1 mi
#24528138 kVWOLVERINE PWR SUPPLY COOP, INCIN SERVICE3.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP140015, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP140015 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROCKPORTSubstation-AdjacentMIPresque Isle County138 kV100 MW2.2 yrs67.2
PORT CALCITESubstation-AdjacentMIPresque Isle County138 kV100 MW2.2 yrs65.4
Greenfield (LIVINGSTON - GALLAGHER)GreenfieldMIOscoda County345 kV600 MW2.2 yrs64.7
TAP140015Substation-AdjacentMIMontmorency County138 kV100 MW2.2 yrs64.6
UNKNOWN133922Substation-AdjacentMIOscoda County138 kV100 MW2.2 yrs63.5
UNKNOWN133169Substation-AdjacentMIMontmorency County138 kV100 MW2.2 yrs63.1
OZ Presque IsleGreenfieldMIPresque Isle2.2 yrs62.6
Greenfield (LIVINGSTON - GALLAGHER)GreenfieldMIOscoda County345 kV600 MW2.2 yrs61.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP140015 substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.