TAP140000

Substation

Michigan

Max voltage
120
kV

TAP140000 is an electric transmission substation in Michigan. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates42.7304, -83.2864

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13015120 kVIN SERVICE9.3 mi
#20666120 kVIN SERVICE0.8 mi
#26401120 kVIN SERVICE8.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP140000, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP140000 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN128466Substation-AdjacentMIMacomb County345 kV600 MW2.2 yrs77.5
DEADEND167215Substation-AdjacentMIMacomb County345 kV600 MW2.2 yrs76.6
WIXOMSubstation-AdjacentMIOakland County345 kV600 MW2.2 yrs76.0
UNKNOWN128894Substation-AdjacentMIWayne County230 kV300 MW2.2 yrs75.4
PLACID 12Substation-AdjacentMIOakland County345 kV600 MW2.2 yrs74.7
UNKNOWN128512Substation-AdjacentMIMacomb County345 kV600 MW2.2 yrs74.7
COVENTRYSubstation-AdjacentMIWashtenaw County345 kV600 MW2.2 yrs74.0
UNKNOWN128381Substation-AdjacentMIOakland County345 kV600 MW2.2 yrs73.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP140000 substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.