TAP138973 is an electric transmission substation in Michigan, operated by NORTHERN INDIANA PUB SERV CO. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorNORTHERN INDIANA PUB SERV CO
Coordinates41.9689, -85.7816

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#32334345 kVIN SERVICE21.1 mi
#34799345 kVNORTHERN INDIANA PUB SERV COIN SERVICE2.1 mi
#46820345 kVNORTHERN INDIANA PUB SERV COIN SERVICE56.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138973, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138973 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP138974Substation-AdjacentMICass County345 kV600 MW2.2 yrs76.8
HIPLESubstation-AdjacentINElkhart County345 kV600 MW2.2 yrs74.1
TAP145860Substation-AdjacentMICass County138 kV100 MW2.2 yrs73.7
TAP138973Substation-AdjacentMICass County345 kV600 MW2.2 yrs73.6
WEEDS LAKESubstation-AdjacentMIKalamazoo County345 kV600 MW2.2 yrs73.0
UNKNOWN122939Substation-AdjacentINElkhart County345 kV600 MW2.2 yrs72.9
TWIN BRANCH (138 KV)Substation-AdjacentINSt. Joseph County138 kV100 MW2.2 yrs72.2
UNKNOWN123080Substation-AdjacentINElkhart County138 kV100 MW2.2 yrs71.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138973 substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.