TAP138703

Substation

Michigan · CONSUMERS ENERGY CO

Max voltage
138
kV

TAP138703 is an electric transmission substation in Michigan, operated by CONSUMERS ENERGY CO. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

OperatorCONSUMERS ENERGY CO
Co-ownerTHUMB ELECTRIC COOP OF MICH
Coordinates43.3676, -83.6595

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3660138 kVTHUMB ELECTRIC COOP OF MICHIN SERVICE0.8 mi
#21708138 kVCONSUMERS ENERGY COIN SERVICE22.7 mi
#23970138 kVCONSUMERS ENERGY COIN SERVICE15.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP138703, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP138703 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN128533Substation-AdjacentMIGenesee County345 kV600 MW2.2 yrs75.1
KARNSubstation-AdjacentMIBay County345 kV600 MW2.2 yrs72.7
GOSSSubstation-AdjacentMIGenesee County345 kV600 MW2.2 yrs72.3
BAUERSubstation-AdjacentMITuscola County345 kV600 MW2.2 yrs72.1
THETFORDSubstation-AdjacentMIGenesee County345 kV600 MW2.2 yrs71.3
UNKNOWN144603Substation-AdjacentMITuscola County345 kV600 MW2.2 yrs71.3
UNKNOWN133854Substation-AdjacentMITuscola County345 kV600 MW2.2 yrs71.1
TAP144602Substation-AdjacentMITuscola County345 kV600 MW2.2 yrs70.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP138703 substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.