TAP137918

Substation

Michigan · COMMONWEALTH EDISON CO

Max voltage
161
kV

TAP137918 is an electric transmission substation in Michigan, operated by COMMONWEALTH EDISON CO. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

OperatorCOMMONWEALTH EDISON CO
Coordinates42.0378, -90.1044

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#31162161 kVCOMMONWEALTH EDISON COIN SERVICE0.0 mi
#36615161 kVCOMMONWEALTH EDISON COIN SERVICE8.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP137918, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP137918 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN122189Substation-AdjacentIAClinton County345 kV600 MW1.4 yrs76.6
UNKNOWN131373Substation-AdjacentIAJackson County345 kV600 MW1.4 yrs75.4
STERLING STEELSubstation-AdjacentILWhiteside County345 kV600 MW1.4 yrs73.1
ROCK CREEKSubstation-AdjacentIAClinton County345 kV600 MW1.4 yrs72.4
UNKNOWN122187Substation-AdjacentIAClinton County161 kV100 MW1.4 yrs70.7
UNKNOWN121972Substation-AdjacentIAScott County161 kV100 MW1.4 yrs70.3
QUAD CITIESSubstation-AdjacentIAClinton County345 kV600 MW1.4 yrs69.3
UNKNOWN121920Substation-AdjacentILJo Daviess County161 kV100 MW1.4 yrs68.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP137918 substation, Michigan. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.