LARK

Substation

Michigan

Max voltage
120
kV

LARK is an electric transmission substation in Michigan. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage120 kV
Min voltage120 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates42.3112, -83.8246

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#36910120 kVIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of LARK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near LARK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP137284Substation-AdjacentMIMonroe County345 kV600 MW2.2 yrs76.4
WIXOMSubstation-AdjacentMIOakland County345 kV600 MW2.2 yrs76.0
TAP137301Substation-AdjacentMIMonroe County345 kV600 MW2.2 yrs74.5
COVENTRYSubstation-AdjacentMIWashtenaw County345 kV600 MW2.2 yrs74.0
MILANSubstation-AdjacentMIWashtenaw County345 kV600 MW2.2 yrs73.4
UNKNOWN128389Substation-AdjacentMILivingston County345 kV600 MW2.2 yrs72.5
APEXSubstation-AdjacentMIWashtenaw County120 kV100 MW2.2 yrs71.8
MAJESTICSubstation-AdjacentMILivingston County345 kV600 MW2.2 yrs71.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.