TAP135425

Substation

Massachusetts · NSTAR ELECTRIC COMPANY

Max voltage
115
kV

TAP135425 is an electric transmission substation in Massachusetts, operated by NSTAR ELECTRIC COMPANY. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorNSTAR ELECTRIC COMPANY
Coordinates41.6975, -70.3886

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#27828115 kVNSTAR ELECTRIC COMPANYIN SERVICE6.4 mi
#32988115 kVNSTAR ELECTRIC COMPANYIN SERVICE3.8 mi
#37451115 kVNSTAR ELECTRIC COMPANYIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP135425, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP135425 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN133428Substation-AdjacentMAPlymouth County345 kV600 MW3.5 yrs68.1
CARVERSubstation-AdjacentMAPlymouth County345 kV600 MW3.5 yrs65.1
PILGRIM NUCLEAR POWER STATIONSubstation-AdjacentMAPlymouth County345 kV600 MW3.5 yrs65.1
TAP135423Substation-AdjacentMAPlymouth County345 kV600 MW3.5 yrs64.5
MARSHFIELDSubstation-AdjacentMAPlymouth County115 kV100 MW3.5 yrs63.6
UNKNOWN133452Substation-AdjacentMAPlymouth County115 kV100 MW3.5 yrs61.9
Greenfield (UNKNOWN133427 - CARVER)GreenfieldMAPlymouth County345 kV600 MW3.5 yrs61.7
UNKNOWN133456Substation-AdjacentMABarnstable County345 kV600 MW3.5 yrs61.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen